Project Ref Ormiston Academy
  • Value: £170,000.00
  • Time Scale: 8 Months
  • System Type: Toshiba 2 Pipe VRF& Split Systems
 
We were approached by a mechanical services customer to partner with them on a new build academy in Thurrock Essex.
 
The original brief was to install a full heat recovery Mitsubishi VRF system which was designed by a building services consultant.
 
But due to budget constraints the whole system had to be redesigned to allow all of the areas required within the building to be heated and cooled with as much individual control as possible.
 
Alongside our Toshiba supplier Amp we carried out the redesign and were able to provide a system that met with all of the parameters laid down by the client and consultant engineer.
 
By using Toshiba equipment we were able to provide a 5 year warranty for the equipment on site.
 
NEWS
Signup for our newsletter
  
TWITTER
9 Nov 2015 - RT @EarnKnowledge: This is what a Tiger mother licking her cub looks like. There are only 3,000 Tigers left remaining in the wild: https://…

6 Nov 2015 - Hope everyone has a bonfire weekend

23 Oct 2015 - RT @BBCBreaking: Latest pictures from France bus crash that killed 42 - mostly pensioners - near #Puisseguin' https://t.co/il7JQaFtRv' https:…